Keyphrases
Sequencing Situations
100%
Shapley Value
73%
Sequencing Games
71%
Covert Networks
64%
Cooperative Game
55%
Chinese Postman
50%
Convexity
50%
Balancedness
50%
Marginal Vector
48%
Game Analysis
48%
Nucleolus
47%
Solution Concepts
41%
Allocation Rules
34%
Terrorist Networks
33%
Covert
32%
Shapley
30%
Cost Savings
28%
Cost Allocation
27%
Assignment Game
27%
Total Joint
27%
Allocation Problem
26%
Optimization Problem
26%
Game Theoretic Approach
25%
Terrorist
24%
Communication Structure
24%
Network Games
23%
Minimum Coloring Game
23%
Gradient Estimation
23%
Population Monotonic Allocation Scheme
23%
Jemaah Islamiyah
23%
Reward Function
22%
Nash Equilibrium
21%
Cooperative Game Theory
21%
Centrality Measures
21%
9/11 Attacks
20%
Splitting Rule
20%
Cost Function
19%
Indivisible Object
19%
Optimal Target
19%
Bankruptcy Game
18%
Resource Allocation Problem
18%
Chinese Postman Problem
18%
Concavity
18%
Monotonic Paths
17%
Joint Payoff
17%
Resource Allocation Games
17%
Star Graph
16%
Multi-actor Perspective
15%
CO2 Transport
15%
Carbon Capture
15%
Computer Science
Connected Graph
27%
Completion Time
27%
Sufficient Condition
27%
Cost Allocation
27%
Network Structure
27%
Centrality Measure
23%
Theoretic Approach
23%
Additive Component
23%
Solution Concept
23%
Star Graphs
22%
cooperative game theory
22%
Allocation Problem
21%
Operational Efficiency
21%
Optimal Network
19%
Cost Saving
15%
Quantitative Approach
15%
Office Location
15%
Closed Formula
15%
Theoretical Framework
15%
Coalition Formation Process
15%
Minimal Winning Coalition
15%
Case Study
15%
Service Provider
15%
Cardinality
15%
Structural Property
11%
Intelligence Agency
11%
Theoretic Analysis
11%
System Operation
11%
Multiple Process
11%
Theoretical Approach
11%
Initial Processing
11%
Nash Equilibrium
10%
Organizational Structure
10%
Optimization Framework
7%
Criminal Organization
7%
Wireless Network
7%
Strategy Profile
7%
Targeted Attack
7%
Network Topology
7%
Structural Position
7%
Criminal Network
7%
Distribution Network
7%
Heuristic Method
7%
Network Design
7%
Job Scheduling
7%
Order Processing
7%
Parallel Machine
7%
Maintenance Group
7%
Intermediate Step
7%
Processing Time
7%