A new heuristic for capacitated single stage production planning

W.J. Selen, R.M.J. Heuts

Research output: Book/ReportReportProfessional

48 Downloads (Pure)
Original languageEnglish
PublisherUnknown Publisher
Volume88.04
Publication statusPublished - 1988

Publication series

NameTer discussie FEW
Volume88.04

Keywords

  • Production Planning
  • Scheduling

Cite this

Selen, W. J., & Heuts, R. M. J. (1988). A new heuristic for capacitated single stage production planning. (Ter discussie FEW; Vol. 88.04). Unknown Publisher.