Original language | English |
---|---|
Pages (from-to) | 909-925 |
Journal | European Journal of Operational Research |
Volume | 183 |
Issue number | 2 |
Publication status | Published - 2007 |
Cite this
Ashayeri, J., & Selen, W. (2007). A planning and scheduling model for onsertion in printed circuit board assembly. European Journal of Operational Research, 183(2), 909-925.
@article{19a3cc175d1c4edaa968ffdf97f27b42,
title = "A planning and scheduling model for onsertion in printed circuit board assembly",
author = "J. Ashayeri and W. Selen",
year = "2007",
language = "English",
volume = "183",
pages = "909--925",
journal = "European Journal of Operational Research",
issn = "0377-2217",
publisher = "Elsevier Science BV",
number = "2",
}
Ashayeri, J & Selen, W 2007, 'A planning and scheduling model for onsertion in printed circuit board assembly', European Journal of Operational Research, vol. 183, no. 2, pp. 909-925.
A planning and scheduling model for onsertion in printed circuit board assembly. / Ashayeri, J.; Selen, W.
In: European Journal of Operational Research, Vol. 183, No. 2, 2007, p. 909-925.Research output: Contribution to journal › Article › Scientific › peer-review
TY - JOUR
T1 - A planning and scheduling model for onsertion in printed circuit board assembly
AU - Ashayeri, J.
AU - Selen, W.
PY - 2007
Y1 - 2007
M3 - Article
VL - 183
SP - 909
EP - 925
JO - European Journal of Operational Research
JF - European Journal of Operational Research
SN - 0377-2217
IS - 2
ER -
Ashayeri J, Selen W. A planning and scheduling model for onsertion in printed circuit board assembly. European Journal of Operational Research. 2007;183(2):909-925.