Performance measures for a centralized material handling in flexible assembly line systems

J. Ashayeri

Research output: Chapter in Book/Report/Conference proceedingChapterScientificpeer-review

Original languageEnglish
Title of host publicationFlexible Automation & Intelligent Manufacturing 1997
EditorsW.G. Sullivan, M.M. Ahmad
Place of PublicationNew York
PublisherBegell House Inc
Pages866-875
Number of pages10
ISBN (Print)1567000894
Publication statusPublished - 1997

Cite this

Ashayeri, J. (1997). Performance measures for a centralized material handling in flexible assembly line systems. In W. G. Sullivan, & M. M. Ahmad (Eds.), Flexible Automation & Intelligent Manufacturing 1997 (pp. 866-875). New York: Begell House Inc.
Ashayeri, J. / Performance measures for a centralized material handling in flexible assembly line systems. Flexible Automation & Intelligent Manufacturing 1997. editor / W.G. Sullivan ; M.M. Ahmad. New York : Begell House Inc, 1997. pp. 866-875
@inbook{37207654c4fb484f954cc5cfae455212,
title = "Performance measures for a centralized material handling in flexible assembly line systems",
author = "J. Ashayeri",
note = "Pagination: 10",
year = "1997",
language = "English",
isbn = "1567000894",
pages = "866--875",
editor = "W.G. Sullivan and M.M. Ahmad",
booktitle = "Flexible Automation & Intelligent Manufacturing 1997",
publisher = "Begell House Inc",

}

Ashayeri, J 1997, Performance measures for a centralized material handling in flexible assembly line systems. in WG Sullivan & MM Ahmad (eds), Flexible Automation & Intelligent Manufacturing 1997. Begell House Inc, New York, pp. 866-875.

Performance measures for a centralized material handling in flexible assembly line systems. / Ashayeri, J.

Flexible Automation & Intelligent Manufacturing 1997. ed. / W.G. Sullivan; M.M. Ahmad. New York : Begell House Inc, 1997. p. 866-875.

Research output: Chapter in Book/Report/Conference proceedingChapterScientificpeer-review

TY - CHAP

T1 - Performance measures for a centralized material handling in flexible assembly line systems

AU - Ashayeri, J.

N1 - Pagination: 10

PY - 1997

Y1 - 1997

M3 - Chapter

SN - 1567000894

SP - 866

EP - 875

BT - Flexible Automation & Intelligent Manufacturing 1997

A2 - Sullivan, W.G.

A2 - Ahmad, M.M.

PB - Begell House Inc

CY - New York

ER -

Ashayeri J. Performance measures for a centralized material handling in flexible assembly line systems. In Sullivan WG, Ahmad MM, editors, Flexible Automation & Intelligent Manufacturing 1997. New York: Begell House Inc. 1997. p. 866-875